Back to Careers

Project Manager (Build)

30th September 2025

Working with Shared Access

Shared Access is a fast-growing independent wireless telecommunications infrastructure company. Our mission is to be the best provider of wireless connectivity in the world. We work with mobile network operators and landlords to design, install, finance and manage wireless networks that deliver great connectivity. We work at a fast pace and embrace change within our results driven culture. There is no doubt that you must be prepared for challenge but will have full support and clearly defined expectations.
Reporting into the Head of Estates, the successful candidate will be responsible for the construction of new and the upgrade of existing infrastructure, working with both internal teams and external stakeholders to ensure the effective management and successful delivery of projects. Hands on training will be provided from the start allowing you to make a positive impact in a short period of time. This is an exciting time to join Shared Access and you’ll be an intrinsic part of our rapid plans for expansion.
This role is primarily based at our office in Lymington, Hampshire with hybrid working available. Travel required to sites within the UK and potentially Ireland on a regular basis.
 

Candidate Duties

Your role will include the following generic duties but will also include department specific duties as well:
· Ensuring that all projects are realistically planned and implemented effectively
· Forecasting and reporting of all project elements against key milestones
· Communicating with external parties including potential and existing landlords, design consultants, utility providers, legal teams, surveyors, build contractors and mobile network operators to effectively drive projects forward
· Maintaining the accuracy of project information in Salesforce (CRM) and SharePoint
· Managing build budgets and completing final accounts
· Coordinating build programme of works with civils contractors, landlords, DNOs, customers and other parties
· Completing various site visits including pre-start construction meetings and snagging visits
· Overseeing key milestones within the build programme including attending site
· Managing the build contractor during the works
· Approving and issuing a handover pack to internal Estates team
· Delivering project within agreed timescales and within budget
 

Candidate Requirements

The ideal candidate will consider themselves a SMART GENERALIST with the following key characteristics:
· Confident and assertive communicator
· Willingness to challenge and equally be challenged
· Proactive with a positive approach/mindset
· Calm under pressure
· Analytical and detail orientated
· Flexible and adaptable to change in a fast-moving environment
· Tenacity and drive to find creative solutions to potential blockers
In return for hard work and a committed approach we offer a fantastic working environment, an attractive remuneration package and a genuine investment in our people. If this sounds like the role you have been looking for, please do get in touch. We look forward to hearing from you.
 

Benefits & Salary

· Salary – depending on experience and to be discussed upon application
· Bonus scheme up to 20% of basic salary per annum
· Hybrid working
· On-site parking
· Private medical Insurance
· Life insurance
· 25 days annual leave plus 2 discretionary Company Days at Xmas
· Car allowance

Notes

· Telecoms experience is not required
· We are not looking for a site manager or someone to undertake physical construction works, but instead a project manager to manage external build contractors to build sites on our behalf
· Previous construction experience not essential.
· Previous project management experience is preferable.
Map

Apply:

First Name

E-mail

CV

Covering Letter

30th September 2025

Our News

22nd August 2025

Edgbaston press release

Givevision/Shared Access world first.

8th July 2025

Shared Access and MERLIN Properties deliver Spain’s first 5G Neutral Host DAS in a commercial office building

Stronger signal, smarter office connectivity

25th June 2025

Shared Access announces 5G upgrade at Aviva Stadium, Dublin

5G Connectivity boost at Aviva Stadium, Dublin

9th June 2025

Shared Access wins prestigious SCF award for life-changing 5G accessibility project

Breaking barriers with private 5G

1st May 2025

NodeTech enters new chapter following acquisition by Shared Access

Christian Anderton announces his exit

18th March 2025

Sam Jackman speaks with Tech For Good

How we’re innovating with our partners in the accessibility space...

National Gallery, London.Read More

Distributed Antennae System (DAS) / Base Station Hotel Solution

PICTURE PERFECT CONNECTIVITY FOR A GLOBAL ICON

After a competitive tender process, we were appointed by the National Gallery (one of the greatest art galleries in the world) to design, deploy, operate and maintain a multi-operator mobile connectivity service within its new office hub at the heart of the famous Grade I listed building in London.

Continue Readingabout the PICTURE PERFECT CONNECTIVITY FOR A GLOBAL ICON case study

A FIRST FOR PREMIER LEAGUE FOOTBALL - CONNECTING 60,000+ FANS

Shared Access and Tottenham Hotspur embarked on an audacious mission in 2017 – to bring world class connectivity to Tottenham’s new stadium.

Building upon Shared Access’ previous experience deploying connectivity in large venues, the new system was designed, installed and fully funded by Shared Access. The stadium opened in April 2019 with all four UK mobile network operators live for the first game – a first in the UK.

Continue Readingabout the A FIRST FOR PREMIER LEAGUE FOOTBALL - CONNECTING 60,000+ FANS case study

STATE OF THE ART TOWER AT HEATHROW

In August 2022 we completed our largest build to-date. The 45m state of the art tower and secure compound at Heathrow provides coverage for the National Air Traffic Services business, all UK mobile operators (EE, O2, Three and Vodafone) and Transport for London. It also has the capacity to take future tenants, allowing for additional connectivity in the Heathrow and Feltham area.

Continue Readingabout the STATE OF THE ART TOWER AT HEATHROW case study

Installation of Wi-Fi 6 at Berthon Marina, Lymington.

During the busy season, Berthon Marina has up to 250 boats in residence, all with multiple devices connecting to the marina’s Wi-Fi.  This was creating a heavily congested network environment and a poor end user experience. Connection speeds were grinding to a halt, with berth holders and visitors frequently being disconnected or simply unable to connect. Card payments for fuel or food and beverage became impossible to process with all the associated customer frustrations and commercial impact.

Continue Readingabout the Installation of Wi-Fi 6 at Berthon Marina, Lymington. case study

Tunnels are historically tough locations to get a phone signal. Traditional masts provide coverage outdoors to locations that can be seen – tunnels by their nature are underground, compact and often have lots of twists and turns that all stop existing outdoor signals from penetrating inside.

The Tyne Tunnel is no different. Originally opened in 1967, the seven miles of tunnels connect the town of Jarrow with North Shields and Howden. The traffic that passes through the tunnel allows vehicles both a way in and out of Newcastle. Over 40,000 vehicles travel through the Tyne Tunnel every day – that’s over 14,000,000 vehicles a year.

Continue Readingabout the case study
Next
Prev

Get in touch with media enquiries